[prompt-analysis] Copilot PR Prompt Analysis - June 20, 2026 #40512
Replies: 1 comment 1 reply
-
|
/q optimize |
Beta Was this translation helpful? Give feedback.
1 reply
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
🤖 Copilot PR Prompt Pattern Analysis — June 20, 2026
Summary
Analysis Period: Jun 1 – Jun 20, 2026 (last 30 days)
Total PRs: 1,000 | Merged: 792 (79.2%) | Closed: 204 (20.4%) | Open: 4 (0.4%)
Overall merge rate is stable at ~79%, consistent with the prior 7-day range (78.6%–79.7%).
Prompt Categories and Success Rates
Prompt Analysis
✅ Successful Prompt Patterns
Common characteristics in merged PRs:
permission,allow,allowlist,normalized,expanded,completingExample successful prompts:
3 merged PR examples
PR Improve max-tool-denials report with recent shell call context #40506 — Improve max-tool-denials report with recent shell call context
PR Reduce Daily Safe Output Integrator tool-denial guardrail trips #40503 — Reduce Daily Safe Output Integrator tool-denial guardrail trips
PR /help: use ### heading, link commands to source workflows #40500 — /help: use ### heading, link commands to source workflows
❌ Unsuccessful Prompt Patterns
Common characteristics in closed PRs:
progress,started,parameters,queue,assignExample unsuccessful prompts:
3 closed PR examples
PR fix(assign-to-agent): remove invalid requiresOneOf constraint, add GraphQL query logging #40488 — fix(assign-to-agent): remove invalid requiresOneOf constraint
PR [WIP] Fix failing GitHub Actions job Integration: Workflow Features #40007 — [WIP] Fix failing GitHub Actions job Integration: Workflow Features
PR [WIP] Extract embedded issue template to shared partial #36743 — [WIP] Extract embedded issue template to shared partial
Key Insights
Recommendations
Based on today's analysis:
--timeoutflag inDownloadWorkflowLogsonly checks elapsed time at loop top" rather than "timeout doesn't work".Historical Trends (Last 7 Days)
Trend: Stable. Success rate has held in the 78.6%–79.7% band for the past 9 days. No significant drift detected. Week-3 (Jun 16–20) shows a slight uptick in Jun 16 (79.7%) followed by regression on Jun 18–20 — the Jun 18–20 dip correlates with increased [WIP] activity (27 open WIP issues vs 16 merged).
References: §27883699237
Beta Was this translation helpful? Give feedback.
All reactions